LED production process, led the whole process of the production process!
Date:2011-06-07 14:32
Status:Be resolved
Question:admin
upport on the first point of silver plastic (insulating plastic) and then use the vacuum nozzle to suck from the LED chip mobile location, automatic pallet is a combination of glue stick (glue) and the installation of the chip are two steps. Then placed in the appropriate stent position. Automatically installed on the main frame in process equipment operation should be familiar with programming, while the equipment and installation of precision plastic stick to adjust. Try to use the selection o
Best answer:
No best answer
[All answers(0)] [Let me answer]